View Details
Bid Classification: |
Services
|
---|---|
Bid Type: | RFP |
Bid Number: | 765672 |
Bid Name: | 765706-RFP-2022-EWSI-9L-Edmonton-DA-GBWWTP Utility Rack Upgrades |
Bid Status: | Closed |
Bid Closing Date: | Thu Jan 19, 2023 2:00:59 PM (MST) |
Question Deadline: | Thu Jan 5, 2023 2:00:00 PM (MST) |
Duration in months: | 23 |
Negotiation Type: | Refer to project document |
Condition for Participation: | Refer to project document |
Electronic Auctions: | Not Applicable |
Language for Bid Submissions: | English unless specified in the bid document |
Submission Type: | Online Submissions Only |
Submission Address: | Online Submissions Only |
Public Opening: | No |
Description: |
EPCOR is looking for one Successful Proponent complete and deliver design and engineering services for the upgrades to the Utility Rack (UR) System at Gold Bar Waste Water Treatment Plant (GBWWTP), and provide procurement and construction support. The scope for Stage 1 is to develop a preliminary design and specifications of the UR system. However, details of the scope of the upgrades should be finalized during design. The Work is divided into three stages:
All stages require a cost estimate for the subsequent stage, engineering schedule, and construction schedule. The award of this RFP will include Work relating to Stage 1, Stage 2 and Stage 3, however, only Work relating to Stage 1 is currently approved. All Work related to Stage 2 and Stage 3 is subject to written authorization from EPCOR to proceed, and such authorization is conditional upon EPCOR receiving all required approvals, and EPCOR being satisfied, in its sole discretion, with the Successful Proponent’s performance and quality of the deliverables during Stage 1. Approval to proceed with the Work as it relates to Stage 2 and Stage 3 is not guaranteed. In the event the required approvals are not received, or in the event EPCOR in its sole discretion is not satisfied with the performance and quality of the Successful Proponent’s deliverables during Stage 1, the Work as it relates to Stage 2 and Stage 3 will be deleted from the scope of Work under the Contract, and EPCOR reserves the right to proceed with subsequent stages with a different Proponent. In such case, EPCOR shall not be liable to the Successful Proponent for any reason for compensation, costs (including change orders), reimbursement or damages on account of the decrease in scope of work or loss of prospective profits or otherwise.
|
Bid Document Access: | Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation. |
Trade Agreements: |
Show Trade Agreements [+]
Canada-European Union Comprehensive Economic and Trade Agreement (CETA)
|
Categories: |
Show Categories [+]
|
Meeting Locations
The following are the meeting times and locations for the bid: