| Bid Classification: |
Goods
|
||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Bid Type: | RFP | ||||||||||||||||||
| Bid Number: | 203661 | ||||||||||||||||||
| Bid Name: | CETR - SCADA Equipment | ||||||||||||||||||
| Bid Status: | Open | ||||||||||||||||||
| Bid Closing Date: | Mon Oct 12, 2026 2:01:59 PM (MDT) | ||||||||||||||||||
| Question Deadline: | Mon Oct 5, 2026 2:01:00 PM (MDT) | ||||||||||||||||||
| Duration in months: | 36 | ||||||||||||||||||
| Negotiation Type: | Refer to bid document | ||||||||||||||||||
| Condition for Participation: | Refer to bid document | ||||||||||||||||||
| Electronic Auctions: | Not Applicable | ||||||||||||||||||
| Language for Bid Submissions: | English unless specified in the bid document | ||||||||||||||||||
| Submission Type: | Online Submissions Only | ||||||||||||||||||
| Submission Address: | Online Submissions Only | ||||||||||||||||||
| Public Opening: | No | ||||||||||||||||||
| Description: |
EPCOR is reviewing its current substation automation infrastructure and searching for opportunities for improvements or updates to our existing equipment for all future substation builds and life-cycle upgrade/replacements The substation automation network consists of several components, where the following items are being re-evaluated:
EPCOR reserves the right to award one, multiple, or all equipment categories to different Proponents based on the results of the evaluation process. The Successful Proponent(s) (there will be at least two Successful Proponents as LAN “A” and LAN “B” devices must be different vendors for network resiliency and reliability) shall supply a portion of the listed components of EPCOR’s substation automation network. Value is added if a Proponent is able to supply a LAN and either or both redundancy network switches. This is a supply only contract, and no installation or commissioning services are required by the Owner. The proposed components will be evaluated by the Owner based on mandatory requirements and compliance with other weighted requirements, as further discussed below. Proponents must meet the mandatory critieria and strive to comply with the non-mandatory technical requirements detailed in the specifications found in Schedule D to become a Successful Proponent. EPCOR makes no representations or warranties regarding the accuracy or completeness of the information contained in this RFP. The Proponent is responsible for making its own evaluation of information and data contained in this RFP and in preparing and submitting its Reply |
||||||||||||||||||
| Bid Document Access: | Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation. | ||||||||||||||||||
| Trade Agreements: |
Show Trade Agreements [+]
Please refer to Tender Description or Tender Documents
|
||||||||||||||||||
| Categories: |
Show Categories [+]
|