View Details
| Bid Classification: |
Goods
|
|---|---|
| Bid Type: | RFP |
| Bid Number: | 797200 |
| Bid Name: | 797200-RFP-2025-EWSI-90-AB-Edmonton-JW |
| Bid Status: | Closed |
| Bid Closing Date: | Tue Aug 12, 2025 2:00:59 PM (MDT) |
| Question Deadline: | Thu Jul 31, 2025 2:00:00 PM (MDT) |
| Duration in months: | 2 |
| Negotiation Type: | Refer to project document |
| Condition for Participation: | Refer to project document |
| Electronic Auctions: | Not Applicable |
| Language for Bid Submissions: | English unless specified in the bid document |
| Submission Type: | Online Submissions Only |
| Submission Address: | Online Submissions Only |
| Public Opening: | No |
| Description: |
While this Request for Proposal (“RFP”) is issued by EPCOR, all services, equipment, prices, terms and conditions, presentations and promotional materials contained in any submission (the “Reply”, as defined below) may, at EPCOR’s sole discretion, apply to any or all of the EPCOR Entities (as defined below). The intent of this RFP is to find a Successful Proponent capable of providing the Work described immediately below. A more detailed description of the Work can be found in Appendix 1 (Information).
This RFP solicits proposal from qualified vendors for the comprehensive supply and installation of office furniture for the new Integrated Operations Center (IOC) which is being completed at the Aurum Road site, located at 2545 Aurum Road, Edmonton, Alberta (the “Project”). The Project encompasses the complete furnishing of a modern, functional operations center designed to support 24/7 monitoring and coordination activities. The Project is currently in design and is anticipated to be completed in Q3 2026. The furniture layouts are as per the Level 3 Furniture Plan (created by GEC) dated July 4th 2025 and quantities of equipment required as part of this RFP is as per the Furniture List dated July 4th, 2025 both found in Schedule “D”. The furniture list, images and layouts are provided in Schedule “D” attachments as a “basis-of-design” which the Proponents are to follow in preparing their response to this RFP.. Proposal must clearly demonstrate adherence to the established “basis-of-design” layout provide in the RFP documentation. While alternatives may be considered where they enhance functionality or value, proposals should maintain the core operational workflow, sightlines and technical integration aspects of the original furniture list.
The selected vendor must demonstrate capability to:
EPCOR seeks a proponent who approaches this project as a partnership, bringing expertise in operations center environments while respecting budget parameters and design intent. The successful vendor will balance adherence to the basis-of-design with value engineering opportunities that maintain or enhance functionality.
|
| Bid Document Access: | Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation. |
| Trade Agreements: |
Show Trade Agreements [+]
Canadian Free Trade Agreement (CFTA)
North American Free Trade Agreement (NAFTA) |
| Categories: |
Show Categories [+]
|
