View Details
Bid Classification: |
Services
|
---|---|
Bid Type: | RFP |
Bid Number: | 753620 753621 753622 753624 753625 |
Bid Name: | Stormwater Facility Improvements EPCOR 753620, 753621, 753622, 753624, 753625 |
Bid Status: | Closed |
Bid Closing Date: | Thu Jun 17, 2021 2:00:59 PM (MDT) |
Question Deadline: | Fri Jun 11, 2021 12:00:00 PM (MDT) |
Time-frame for delivery or the duration of the contract: | Refer to project document |
Negotiation Type: | Refer to project document |
Condition for Participation: | Refer to project document |
Electronic Auctions: | Not Applicable |
Language for Bid Submissions: | English unless specified in the bid document |
Submission Type: | Online Submissions Only |
Submission Address: | Online Submissions Only |
Public Opening: | No |
Description: |
EPCOR owns and operates the five (5) locations for wet Stormwater Management Facility (SWMF), and previously completed Phase I of the safety review in June 2017, which included a jurisdictional review of existing SWMF standard and best practices, a gap analysis, a review of bylaw enforcement, and development of an education strategy. Phase II assessed the site specific risk of each location SWMFs, identified risk mitigation measures, and prioritized the SWMFs for implementation. SWMFs were identified by EPCOR as high priority based on risk assessments workshops conducted between internal and external stakeholders.
It was noted in the Phase II SWMF Review that most serious SWMF safety incidents occur at locations where there is easy access to the SWMF shoreline. Stantec has proposed the concept of the “Multi-barrier” approach. The multi-barrier approach discourages people to approach the shoreline by introducing a series of visual barriers between people and shoreline |
Bid Document Access: | Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation. |
Trade Agreement Description: |
Show Trade Agreement Description [+]
CFTA
|
Categories: |
Show Categories [+]
|
Meeting Locations
The following are the meeting times and locations for the bid: