View Details
Bid Classification: |
Construction
|
---|---|
Bid Type: | RFP |
Bid Number: | 768846-RFP-2023-EWSI-90-AB-Edmonton-JH |
Bid Name: | Primary Effluent (PE) Channel Upgrade |
Bid Status: | Closed |
Bid Closing Date: | Fri Mar 17, 2023 2:00:59 PM (MDT) |
Question Deadline: | Thu Mar 9, 2023 2:00:00 PM (MST) |
Duration in months: | 35 |
Negotiation Type: | Refer to project document |
Condition for Participation: | Refer to project document |
Electronic Auctions: | Not Applicable |
Language for Bid Submissions: | English unless specified in the bid document |
Submission Type: | Online Submissions Only |
Submission Address: | Online Submissions Only |
Public Opening: | No |
Description: |
Note: Proponents are to sign the attached Exhibit 1 - Confidentiality Agreement and email a copy to James Howard – jhoward@epcor.com. Upon receipt of such executed Confidentiality Agreement, EPCOR will execute the Confidentiality Agreement and provide the Proponent with a copy of the Annex B document. Refer to section 2.3 of the NRFP Main Body for additional details. All the work related to the Gold Bar Wastewater Treatment Plant (“WWTP”) Primary Effluent Channels will be carried out as a program of interrelated and interconnected projects. This Request for Proposal is for Phase 1 only and in general includes (to be confirmed as part of the Validation process):
These upgrades focus on increasing the functionality of the chamber by providing the ability to isolate parts of the chamber for routine maintenance work and to facilitate completion of future phases of the program. The existing inlet flume that feeds the downstream header channel to the Bioreactor 1-3 is smaller than the header channel itself causing a bottleneck. Phase 1 of the project will also include the demolishing and construction of an appropriately sized flume to solve the bottleneck. During the construction, the Bypass Chamber will be isolated, and flows bypassed. The temporary bypass system will accommodate the complete flow regime (high and low flows) and will remain in operation throughout the construction phase. Throughout Phase 1, from Validation through to Closeout, it is expected that the project team co-locates at Gold Bar. A temporary co-location site may be required until a more permanent location can be set up on site. Construction and design will only proceed if validation is accepted by EPCOR; furthermore the project must also receive internal EPCOR funding and approvals. There may be a schedule gap, in the magnitude of a couple months, between submission of the validation report and approval to proceed into design.
Based on the success of the current project (this NRFP), EPCOR may consider doing future phases as traditional or Integrated Project Delivery (IPD) projects. EPCOR may consider, in its sole and unfettered discretion, award of the future phases to the successful proponents of this NRFP. EPCOR will also reserve the right to competitively bid part of or all the future phases if it is deemed most favourable to the interests of EPCOR. |
Bid Document Access: | Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. There is no cost to obtain an unsecured version of the document and /or to participate in this solicitation. |
Trade Agreements: |
Show Trade Agreements [+]
Canada-European Union Comprehensive Economic and Trade Agreement (CETA)
Canadian Free Trade Agreement (CFTA) North American Free Trade Agreement (NAFTA) |
Categories: |
Show Categories [+]
|
Meeting Locations
The following are the meeting times and locations for the bid: